We are the carbon and energy team for Filipino mid-market manufacturers, hotels, cold-chain operators and industrial estates that don't want a 200-slide deck — they want kWh on the floor and a DOE submission that lands.
"If your carbon strategy can't survive a Tuesday on the production floor, it isn't a strategy. It's a PDF."
— Founder's note
A Certified Energy Manager embedded in your plant 1–4 days per month. Owns your audit programme, M&V, and the boardroom conversation. The senior hire you can't justify full-time.
DOE Type 1/2 audits, ISO 50001 build-out, heat-pump & chiller retrofits, M&V plans. Fixed-scope, fixed-fee, signed off by an accredited ECO.
Calculators, templates, the SEC report skeleton. For when you don't need us yet.
Mid-market plant rooms, cold chains, food & beverage lines, hospitality back-of-house. The boring half of the building — where the meter actually spins.
Walk-through, instrumented, and full-stack audits compliant with RA 11285 and the DOE's Energy Efficiency & Conservation Act. Deliverable is the report your DOE evaluator will accept and your CFO will fund.
Read brief →
EnMS gap analysis, energy review, baseline & EnPI design, internal audit, certification dry-run. We handle the documentation set; your team owns the system at handover.
Read brief →
If your plant burns >500 TOE/yr you're a Designated Establishment. We handle the annual reporting, energy efficiency plan, and Certified Energy Manager appointment.
Read brief →
LPG-to-heat-pump feasibility, COP modelling under PH ambient conditions, OEM-agnostic spec, M&V plan to IPMVP Option C. We don't sell equipment — we specify it.
Read brief →
Listed companies subject to SEC Memo 4-2019. Scope 1/2 (and material Scope 3) inventory, GRI/IFRS-aligned disclosures, assurance-ready data trail.
Read brief →
IPMVP Options A–D. Baseline modelling, regression, normalisation for production volume and weather. The maths your savings claim has to survive.
Read brief →
A 12,000-pallet frozen storage facility was paying for ice it didn't need. We rebuilt the suction-pressure setpoint logic, sequenced the screws against measured load, and installed M&V per IPMVP Option B. Capex: ₱4.2M. Annualised saving: ₱14.8M.
Read the full case →
The maths behind a payback case, a COP estimate, or a carbon inventory is just maths. We've put the calculators we use internally on the public web. Use them. Send them to your CFO. If the numbers don't pencil, we'd rather you find out before you call us.
Open Engineering Hub →