We are the carbon and energy team for Filipino mid-market manufacturers, hotels, cold-chain operators and industrial estates that don't want a 200-slide deck — they want kWh on the floor and a DOE submission that lands.

23 yrsCumulative practice
140+Audits delivered
ISO 50001Lead auditor
DOEAccredited ECO
— A note from the practice

"If your carbon strategy can't survive a Tuesday on the production floor, it isn't a strategy. It's a PDF."

— Founder's note

RA 11285 compliance / ISO 50001 / DOE Type 2 audits / M&V (IPMVP) / Heat-pump retrofits / Cold-chain optimisation / SEC sustainability reports / Designated Establishments / RA 11285 compliance / ISO 50001 / DOE Type 2 audits
01How we work

Three tiers, on purpose.
Most carbon work is over-priced or under-priced compliance.
We do neither — and we tell you which one you actually need.

TIER 01 · STRATEGIC

Fractional CEM
on retainer.

A Certified Energy Manager embedded in your plant 1–4 days per month. Owns your audit programme, M&V, and the boardroom conversation. The senior hire you can't justify full-time.

From₱180,000 / month
Read the brief
TIER 02 · DELIVERY

Project
execution.

DOE Type 1/2 audits, ISO 50001 build-out, heat-pump & chiller retrofits, M&V plans. Fixed-scope, fixed-fee, signed off by an accredited ECO.

ScopedFrom ₱350k
Browse projects
TIER 03 · TOOLS

Self-serve.

Calculators, templates, the SEC report skeleton. For when you don't need us yet.

FreeEngineering Hub
Open hub
23%
Avg. energy reduction across audits delivered FY24
14mo
Median payback on retrofits we've specified
100%
DOE submissions accepted on first review
1:1
You speak to the engineer. There is no account manager.
02·aWhere we work

Mid-market plant rooms, cold chains, food & beverage lines, hospitality back-of-house. The boring half of the building — where the meter actually spins.

Cold-storage facility door
Cold storage3PL · frozen / chilled
Industrial cheese vat line
Food & dairyprocess heat · utilities
Industrial laundry row
Hospitalitylaundries · hotels
Beverage bottling line
Beveragebottling · carbonation
Cold-storage produce racks
Agro-logisticscold chain · export
02Services

The full stack, no upselling.

All services
Engineer surveying a refinery at sunset
S/01

Energy audits
(DOE Type 1 & 2)

Walk-through, instrumented, and full-stack audits compliant with RA 11285 and the DOE's Energy Efficiency & Conservation Act. Deliverable is the report your DOE evaluator will accept and your CFO will fund.

Read brief →
Heat exchanger plant room
S/02

ISO 50001
build & certify

EnMS gap analysis, energy review, baseline & EnPI design, internal audit, certification dry-run. We handle the documentation set; your team owns the system at handover.

Read brief →
Pharmaceutical production cleanroom
S/03

DOE Designated
Establishment compliance

If your plant burns >500 TOE/yr you're a Designated Establishment. We handle the annual reporting, energy efficiency plan, and Certified Energy Manager appointment.

Read brief →
Bank of rooftop air-cooled chillers
S/04

Heat-pump &
chiller retrofits

LPG-to-heat-pump feasibility, COP modelling under PH ambient conditions, OEM-agnostic spec, M&V plan to IPMVP Option C. We don't sell equipment — we specify it.

Read brief →
Industrial estate with rooftop solar PV
S/05

SEC sustainability
reporting

Listed companies subject to SEC Memo 4-2019. Scope 1/2 (and material Scope 3) inventory, GRI/IFRS-aligned disclosures, assurance-ready data trail.

Read brief →
Reverse osmosis water treatment plant
S/06

Measurement
& Verification

IPMVP Options A–D. Baseline modelling, regression, normalisation for production volume and weather. The maths your savings claim has to survive.

Read brief →
Cold-storage produce racks
— Project R-2024-014 · Cold storage · Cavite
12,000 pallet frozen · compressor sequencing rebuild
FY24 Q3 — Q4
— Case · Cold storage · Cavite

2.4 GWh/yr off the meter.
14-month payback.
No new compressors.

A 12,000-pallet frozen storage facility was paying for ice it didn't need. We rebuilt the suction-pressure setpoint logic, sequenced the screws against measured load, and installed M&V per IPMVP Option B. Capex: ₱4.2M. Annualised saving: ₱14.8M.

Saving
23.1% kWh
Payback
14.2 months
Scope-2 cut
1,612 tCO₂e/yr
Audit type
DOE Type 2
Read the full case
Energy flow · before vs. after
kWh/yr
BEFORE 10.4 GWh Compressors 47% Cond. fans 22% Defrost 15% Other 16% AFTER 8.0 GWh — 23.1% ↓ Saved 2.4 GWh M&V · IPMVP OPT B · 12-MO BASELINE · 99% CI
Refrigerant cylinder label, R-410A
— H/04 · Refrigerant GWP lookup
The maths is just maths.
We've put it on the public web.
03Engineering Hub

Free tools, because most of this isn't proprietary.

The maths behind a payback case, a COP estimate, or a carbon inventory is just maths. We've put the calculators we use internally on the public web. Use them. Send them to your CFO. If the numbers don't pencil, we'd rather you find out before you call us.

Open Engineering Hub
— Where to start

Tell us what's on the meter.
We'll tell you what's worth doing.